Site Work by M.T. Mayo Corp.
McCall Middle School Winchester, MA
McCall Middle School – Phase II Addition, Winchester, MA
Duration: April 2019 to August 2020
This was a prevailing wage project regarding a classroom & cafeteria addition at the McCall Middle School in Winchester, MA.
Project scope:
- Site Preparation & Demolition (Erosion control, Temporary Roadway, demolition of existing concrete retaining wall and stairs)
- Earthwork (Excavate for building foundations, Excavate and backfill under slab plumbing, subbase and base courses for slabs and roadways)
- Utilities (R&D existing underground utilities, install drainage piping and structures.
- Install new infiltration basin, provide new sewer piping and structures, provide 4 new precast light pole bases and associated trenching for new conduit.