Site Work by M.T. Mayo Corp.

McCall Middle School Winchester, MA

McCall Middle School Phase II Addition, Winchester, MA

Duration: April 2019 to August 2020

This was a prevailing wage project regarding a classroom & cafeteria addition at  the McCall Middle School in Winchester, MA.

Project scope:

  • Site Preparation & Demolition (Erosion control, Temporary Roadway, demolition of existing concrete retaining wall and stairs)
  • Earthwork (Excavate for building foundations, Excavate and backfill under slab plumbing, subbase and base courses for slabs and roadways)
  • Utilities (R&D existing underground utilities, install drainage piping and structures.
  • Install new infiltration basin, provide new sewer piping and structures, provide 4 new precast light pole bases and associated trenching for new conduit.