Site Work by M.T. Mayo Corp.

Apartment Complex – Revere, MA

Site Work 90 Ocean Ave. Revere, MA Residences

Duration: May 2019 to May 2021

Construction of a new six story-75-unit, residential building. 

Project scope:

  • Site Preparation (Erosion control, Excavate and dispose paving and concrete drain structures, Install well point de-watering system with Frac tanks, Assist Helical drilling corporation with the installation of 200 rigid Inclusion grouted piles that had to be cut off 1’ bellow footing elevation to allow for a 12” stone pad under footing)
  • Earthwork (Excavate for building footings and foundation walls, Truck off site all unsuitable material to the Marilyn’s Landing disposal facility in Bridgewater MA (5000cy), Backfill for footings and walls- Back fill for under slab plumbing.
  • Utilities (Connect new 8″ fire and 4″ domestic service laterals to existing 12″ main, connect new 8″ sewer service lateral to exist 15″ main, install drainage piping and structures, install new infiltration system, Excavate, and backfill primary and secondary duct bank, Excavate and backfill for Communications/Telephone duct Bank
  • Site Finish Items (Gravel preparation under paving, sidewalks and under porous paver, furnish and install granite curbs)